Skip to content
SRQ Woodworks Co. logo
Madeira Beach, Florida ground-level duplex drying out in autumn after storm surge flooding

Pinellas County · about 60 min (46 mi) from the shop

Kitchen Remodeling in Madeira Beach, FL

Replacement kitchens for Madeira Beach homes flooded in 2024, with salt-tolerant construction and cabinets finished in Sarasota before delivery.

  • Built in our Sarasota shop since 2011
  • 4.4★ from 52 Google reviews
  • 3D model before anything is built
  • Solid-wood boxes, dovetail drawers

Two storms two weeks apart changed kitchen remodeling in Madeira Beach. Helene's surge in late September 2024 flooded ground-floor living spaces along the Gulf and bay sides, and Milton followed in October, so many owners are replacing entire kitchens rather than repairing them. Those replacement kitchens come out of our Lewis Ave workshop in Sarasota, roughly an hour (46 miles) south across the Sunshine Skyway, and go in during a few carefully planned visits.

This city of 3,895 residents (2020) sits on a narrow strip of barrier island, which shapes every rebuild decision.

John's Pass, Ground-Level Cottages and Bay-Side Canal Homes

Madeira Beach runs along Gulf Boulevard from John's Pass northward, with condo buildings and motels on the Gulf side and older single-story homes, duplexes and canal-front houses toward Boca Ciega Bay. Much of the older stock was built at or near grade on slab, which is exactly where surge does its worst work: base cabinets wick salt water up through the toe kick, countertops lose their support, and wall cavities behind the cabinets stay wet long enough for mold. Elevated homes and upper-floor condos usually came through with their kitchens intact, but ground-level storage, laundry and entertaining areas under them often need new cabinetry. Owners rebuilding at grade increasingly ask for raised plinth bases, sealed end panels and hardware that will not rust in salt air.

Much of the bay side is younger ground than it looks: dredging and fill in the 1950s and 1960s expanded the island, and construction boomed through the 1970s and 1980s, which is when many of today's at-grade duplexes and canal houses went up. The 2020 Census counted 3,937 housing units and found 45 percent of them vacant on census day, a sign of how many are seasonal homes or rentals. An empty unit can sit with a slow leak for weeks, so for absentee owners we leave a removable toe kick under the sink and dishwasher where a battery leak sensor fits and can be checked.

Swollen particleboard base cabinets after Helene's surge in a Madeira Beach kitchen
Particleboard base cabinets swollen and delaminated after salt-water flooding.

What to Expect Once Your Walls Are Dry

We schedule the measure once mitigation is finished and walls are open or replaced. On that visit we record every lost cabinet for your insurance file and confirm new floor heights. From those numbers we draw the kitchen and model it in 3D; you can walk through it on screen or at our Sarasota shop by appointment. While the drywall, electrical and plumbing trades work under permit, we build and finish the cabinets in our shop, so the install can start as soon as the room is ready. Stone templating is booked with the fabricator after the cabinets are set.

Gulf Boulevard, the Causeway and the City's 50 Percent Review

We reach the island over the Tom Stuart Causeway from Seminole. Before finalizing a ground-floor rebuild, talk to the City of Madeira Beach's floodplain manager: under the FEMA/NFIP substantial-damage rule the city administers, repairs that reach half of a building's market value require the structure to meet current flood standards. Our guide to flooded kitchen cabinets and what to do first covers the early steps. We also serve Treasure Island and Seminole.

John's Pass itself was cut by the 1848 hurricane remembered as the Gale of '48, and the boardwalk along it is now the city's entertainment district on the Intracoastal. The Church By The Sea, built from 1944 to 1946 and nicknamed the Chicken Church for the shape of its tower, and Taylor Lake, known for its sunsets, are other local markers. Madeira Beach runs its own building department rather than relying on the county, so permits for a ground-floor rebuild are filed with the city, the same place the substantial-damage question is decided.

Rebuilt Madeira Beach kitchen with sealed white oak cabinets on raised plinth bases
Sealed white oak cabinets on raised plinths with stainless hardware in a rebuilt beach kitchen.

Get directions to the Lewis Ave shopRead customer reviews

Storm-Damaged Kitchen Repair and New Cabinets for Madeira Beach

For most Madeira Beach owners right now, it comes down to these.

Storm damaged kitchen with lower cabinets removed and walls cut open for drying in a Florida home

Storm-Damaged Kitchen Repair

Measuring, documenting and rebuilding kitchens lost to Helene's surge, matched to what was there or redesigned. Ground-floor kitchens in at-grade duplexes took the deepest water, and some took water again when Milton followed.

Solid wood cabinets in Sarasota built from natural cherry with frame-and-panel doors in a warm kitchen

Solid Wood Cabinets

Solid-wood boxes that dry out and survive a minor wetting far better than the particleboard that failed in 2024. Stainless hinges and slides matter as much as the wood this close to the Gulf.

Remodeled kitchen in a Sarasota, Florida home with solid wood cabinets, a walnut island and lanai doors

Kitchen Remodeling

A full kitchen redesign for homes being elevated or substantially rebuilt. Elevated rebuilds on the bay side often move the kitchen up a level, which changes everything from stair location to plumbing runs.

Screened lanai outdoor kitchen with teak doors and granite top beside a Sarasota pool at dusk

Outdoor Kitchens

Salt-air outdoor cabinetry for the ground level beneath raised homes. We use dense hardwoods or marine-grade panels, stainless hardware and finishes that tolerate direct Gulf sun and salt spray.

Hurricane kitchen rebuild with new cabinets installed in a Gulf Coast home after storm damage

Hurricane Kitchen Rebuild

Kitchens on Madeira Beach that took Helene's surge and then Milton's often need a full rebuild sequenced with drywall, electrical and plumbing; we time cabinet production so the boxes are ready when the room is.

Modern kitchen cabinets in Sarasota with high-gloss white frameless doors and a long wood-grain island

Modern European Cabinets

Upper-floor condos on the Gulf side of Madeira Beach that came through 2024 dry often want an update instead; frameless flat-panel cabinets fit tight condo layouts and wipe clean of salt film easily.

Custom outdoor furniture in Sarasota: ipe dining table and chairs on an open pool deck at sunset

Outdoor Furniture

Teak and other dense hardwoods hold up on Madeira Beach balconies facing the Gulf; we build tables and benches sized to a narrow condo balcony and finished for sun and salt.

Reviews

What customers near Madeira Beach say

4.4★ average from 52 reviews on Google. Quotes are from public Google reviews, shortened where marked.

“Graham, PJ and the team at SRQ were exceptional. Creative design for a massive library/wall unit that was a blend of modern and traditional. Outstanding workmanship. Highly recommend!”
Chris B. · Google review · about 2021
“Best of the best in every way!! I interviewed 8 carpenters for a custom built-in job I wanted for our living room and dining room. If you've lived in Sarasota for any length of time, you will know that it's very hard to find reliable help. That is NOT the case with SRQ Woodworks.”
Katelyn M. · Google review · about 2021

FAQ

Madeira Beach kitchen remodeling questions

Should I wait for a substantial-damage determination before ordering cabinets?

Yes, for a ground-floor kitchen in Madeira Beach. The city's floodplain manager decides whether repair costs cross the FEMA 50 percent threshold, and that decision can require elevation or other changes that alter the kitchen's size or height. We can measure and draw in the meantime, then build once the scope is confirmed.

What cabinet construction holds up in a Madeira Beach flood zone?

Solid-wood or marine-grade plywood boxes, sealed on all faces, set on separate raised bases, with stainless or solid brass hardware. No cabinet is flood-proof, but this construction tolerates a minor wetting and can often be dried and refinished, unlike the particleboard that failed in so many island kitchens during 2024.

Nearby

Also serving near Madeira Beach

1121 Lewis Ave, Sarasota

About a quarter mile east of US 301, off 12th Street. Shop visits are by appointment. Please call ahead before stopping by Lewis Ave.

See every service area · Pinellas County overview

Living Well Crafted

Planning a kitchen in Madeira Beach? Talk it through with the shop.

  • Built in our Sarasota shop since 2011
  • 4.4★ from 52 Google reviews
  • 3D model before anything is built
  • Solid-wood boxes, dovetail drawers
SRQ Woodworks Co. · 1121 Lewis Ave, Sarasota, FL 34237 · Monday – Saturday 8:00 am – 6:30 pm · Sunday Closed · Shop visits are by appointment. Please call ahead before stopping by Lewis Ave.
Call (239) 545-0550Get a Quote